CareyMC has delivered civil, building, port and remediation projects across Western Australia for government, resources and industrial clients, along with special remote projects on the Tiwi Islands (NT) and the Cocos (Keeling) Islands.
Carey's civil projects demonstrate our ability to deliver across complex infrastructure environments. Our experience is supported by long-term client relationships and a commitment to quality delivery.
Main Roads WA (Wongutha Way Alliance) · Laverton WA · Dec 2019 - Sept 2021
An alliance between Main Roads WA, Carey and Central Earthmoving to seal the first 40 km of the Great Central Road east of Laverton, part of the 2,700 km Outback Way. Road construction began in August 2020 and reached practical completion on 17 September 2021, ahead of schedule and with sector-leading Indigenous participation.
Water drilling and gravel pits, with all basecourse gravel and construction water found along the road alignment
Embankment earthworks, pavement, drainage and sealing, then signs and line marking
Design development for future work packages
Two civil-construction training programs delivered
40 km
Sealed road constructed
In a remote location, three weeks ahead of the revised schedule
0.00
LTIFR
Over40%
Aboriginal site hours
Over 40% of site hours worked by Aboriginal people, 17% by local Aboriginal people
24.8%
Spent with local business
Of contract value
Berth 2 Hardstand Renewal
Southern Ports Authority · Esperance WA · 2023 · $9.25M
Renewal of 13,500 m² of container hardstand and construction of a 220 kL stormwater First Flush Tank, delivered while keeping a busy berth operational throughout.
Full drainage renewal, cement-stabilised pavement and 180mm asphalt
Demolished asphalt and concrete crushed and reused on site
Berth 2 remained operational throughout via staged delivery
13,500 m²
Container hardstand renewed
220 kL
First Flush Tank
Stormwater
2,500 kL/day
Dewatering
With a 96m sheet-pile cofferdam
$9.25M
Contract value
OB35 Creek Diversion, TSF1 & TSF3
BHP · Pilbara WA · 2023 - 2024 · Multi-discipline
A multi-discipline tailings, earthworks and infrastructure package: tailings dam lift, creek diversion, pipeworks, electrical and instrumentation, awarded on the strength of prior bulk-earthworks delivery.
Asbestos-contaminated-material management, drainage, culverts and pits
Loading-gantry steelwork and a control-centre building
Concrete foundations, slabs and bund walls, with constructability advice that cut the concrete needed
An Indigenous trainee labourer funded through to a non-slewing crane operator licence
1,000+m³
Of concrete
Poured across the site
Six
Disciplines in one package
Earthmoving, concrete, steel, HVAC, electrical and plumbing
Lump sum
Contract
July 2017 to March 2018
All projects
Every civil, building and coastal project across Western Australia, plus special remote projects on the Tiwi Islands (NT) and the Cocos (Keeling) Islands.
Department of Transport · Two Rocks Marina WA · Feb - Oct 2022
Built new footpaths, parking, underground services, public toilets, barbecues and the 'Birdman' architectural shelter along more than 800 m of foreshore, with public access kept open throughout.
Client on request · Newman WA · Jul 2023 - Mar 2024
Renovated staff homes, some more than 50 years old, removing hazardous materials and fitting new kitchens, bathrooms, flooring, sheds and carports to designs by Carey's Indigenous architects.
Fremantle Port Authority · Fremantle Port WA · Jul - Oct 2023
Removed the end-of-life steel pylon fender system at H Berth and tied a new fender system into the existing concrete deck, working around ships at a live port.
Widened and rebuilt South Coast Highway at the Bukererup Road and Collier Road intersections, a Black Spot road safety project, while keeping traffic flowing.
Main Roads WA (Wongutha Way Alliance) · Laverton WA · Dec 2019 - Sept 2021
An alliance with Main Roads WA and Central Earthmoving to seal the first 40 km of the Great Central Road east of Laverton, part of the 2,700 km Outback Way.
Demolished four redundant concrete water tanks, removed asbestos pipes and equipment, recycled the crushed concrete and steel, and finished two weeks ahead of schedule.
Repaired and refurbished a corroded equipment shed: stripped the cladding, cleaned, repainted and corrosion-protected the reusable steel, then enclosed the building in materials chosen for the tropical coast.
Built a heavy vehicle parking bay and rest stop, covering earthworks, drainage, pavement, sealing, signs and lines, on an embankment raised with 22,000 tonnes of imported gravel.
Southern Ports Authority · Esperance WA · Jul - Oct 2021
Dismantled the redundant minerals shiploader, conveyor galleries and transfer towers at Berth 2, more than 520 tonnes of fabricated steel, with no adverse effect on shipping.
Department of Infrastructure · Cocos (Keeling) Islands · Sept - Oct 2020
Refitted the dental clinic with specialist cabinetry, upgraded hydraulic and electrical services and new vinyl flooring, then serviced and commissioned the dental equipment for a turn-key handover.
Southern Ports Authority · Esperance WA · Aug - Oct 2020
Removed the existing diesel pipeline, including buried and under-wharf pipework, and installed a new DN350 (350 mm) pipeline and concrete connection pit with no interruption to through traffic.
Jones Lang LaSalle (WA) · West Island and Home Island, Cocos (Keeling) Islands · Jan - Feb 2020
Turned the asbestos-contaminated former toilets at both school campuses into storerooms, safely removing the asbestos linings and fitting new walls, ceilings, vinyl flooring and doors.
Italia Stone Group / Department of Transport · Esperance WA · Aug 2019 - Apr 2020
Under subcontract, built the bridge and completed the structural and services works for the new weir, including an 85 m vinyl sheet pile cut-off wall and 20 m driven tubular piles.
Jones Lang LaSalle (WA) · West Island and Home Island, Cocos (Keeling) Islands · Jun - Jul 2019 and Jan 2020
Abrasive blasted and painted corroded structural steel at both campuses during school holidays, replacing steel where corrosion was severe, with 77.5% of the workforce local residents.
Department of Health · Mandurah WA · Dec 2019 - Mar 2020
Fabricated and installed transportable buildings providing eight offices, two universal access toilets and a storeroom, with site preparation and service connections.
Jones Lang LaSalle (WA) · West Island and Home Island, Cocos (Keeling) Islands · Mar - Aug 2019
Designed, supplied and installed two prefabricated toilet blocks for the two school campuses, commissioned before the old facilities were taken out of service.
Tiwi Enterprise Pty Ltd · Tiwi Islands NT · Sept 2018 - Nov 2019
Built a visitor centre and two ferry landings, one on each side of the Apsley Strait, with 75% of the contract value delivered by Northern Territory businesses.
Department of Defence · West Island Airport, Cocos (Keeling) Islands · Oct 2017 - Nov 2018
Built new landside facilities for the Royal Australian Air Force, including a flight line building, an oxygen bottle store, a ground support equipment warehouse and a vehicle shelter.
Parks and Wildlife Service, Department of Biodiversity, Conservation and Attractions · Adenia Park, Riverton WA · Jan - Mar 2018
Built an interpretation trail with an extended concrete path, four sandblasted interpretation nodes and four precast concrete benches, telling the history of the Sikh community and the Whadjuk People.
Jones Lang LaSalle (WA) · West Island, Cocos (Keeling) Islands · Mar 2019
Excavated and screened 300 m³ of playpark material to remove asbestos-containing material, replaced it with clean fill, and added a new perimeter fence and shade sail.
Converted an existing evaporation basin into a lined water treatment pond and installed site drainage, without delaying the bulk cargo terminal operating around the works.
Department of Finance, Building Management and Works · Karratha WA · Jul - Nov 2016
Designed and built a secure compound for 20 fleet vehicles and a bus, with concrete pavement, security fencing, automatic gates, security lighting and swipe card access.
Fixed ceiling condensation in the Australian Federal Police building with a new air-conditioning system, better air tightness and replaced ceilings and walls, while the building stayed occupied.
Replaced the gangway, relocated essential services and reinstated security fencing, working within tidal constraints while nearby tug berths and port operations kept running.