Bandy Creek Weir Reinstatement
Bridge construction and the structural and services works for the new Bandy Creek weir at Esperance, delivered under subcontract.
- Client
- Italia Stone Group / Department of Transport
- Location
- Esperance WA
- Duration
- August 2019 to April 2020
- Contract
- Lump sum
Since the Bandy Creek Boat Harbour was built in the mid-1980s, a weir at the rear of the dredged river mouth has protected the upstream Lake Warden System Ramsar site from drying out, kept sediment out of the boat harbour and provided a crossing over the creek.
The original structure, and a second built on the same spot in 2010, were both damaged beyond repair by major weather events and flooding. The third is a rock weir with a 10 m deep vinyl sheet pile cut-off wall and a separate bridge, 50 m upstream of the first site. Carey was awarded the bridge construction, structural and services works under subcontract.
85 m
Sheet pile cut-off wall
Vinyl, along the weir alignment
20 m
Driven tubular piles
For the bridge foundations
28%
Of project labour
By Aboriginal employees
8%
Of contract value
Delivered by Aboriginal businesses
Scope of works
- An 85 m vinyl sheet pile cut-off wall along the weir alignment
- 20 m driven tubular piles for the bridge foundations
- Precast headstocks and road planks
- Critical services (sewer, water and telecommunications) across the new bridge
- Management of the demolition of the existing weir
Aboriginal participation
As an Aboriginal business, Carey set out to provide opportunities for local Aboriginal people and businesses wherever possible. Aboriginal employees made up 28% of project labour, and 8% of the contract value was delivered by Aboriginal businesses.
Training and upskilling were provided in boat operation (coxswain), crane dogging and mobile plant operation. Carey also helped the local Native Title Aboriginal Corporation establish its business arm, with support and advice.
Gallery
More projects
-

Tiwi Islands Ferry Terminals and Visitor Centre
A visitor centre and two ferry landings, one on each side of the Apsley Strait, delivered by two Indigenous-owned businesses.
-

Berth 2 Hardstand Renewal
A renewed container hardstand and a 220 kL stormwater holding tank at Esperance Port, delivered while the berth stayed open.
-

Fremantle Port Fender Replacement
Demolition and replacement of the ship fender system at H Berth, carried out at a working port.