Fremantle Port Fender Replacement
Demolition and replacement of the ship fender system at H Berth, carried out at a working port.
- Location
- H Berth, Fremantle Port
- Client
- Fremantle Port Authority
- Duration
- July to October 2023
- Contract type
- Lump sum
The fender system at H Berth had reached the end of its life and was outdated and damaged. Carey was awarded the tender to remove the redundant system and replace it with a new, modern fender system.

Scope of work
- Removal of the existing steel pylon fender system
- Tie-in of the new fender support to the existing concrete deck
- Working around a live port, protecting ships and mooring lines during demolition
- Meeting tight timelines during port shutdowns and between shipping schedules
New techniques
- A hydro-demolition robot, used to remove selected areas of concrete without damaging the reinforcing
- A mobile booth to contain demolition activities and protect ships in berth
- Mobile counterweight scaffolds: temporary supports that can be moved easily when a ship needs to berth
The result
Several of these initiatives have since become standard practice at Fremantle Port.
The project is a strong example of Carey’s ability to deliver technically complex work in challenging environments, to demanding schedules and site constraints.
Gallery
More projects
-

Esperance Port Shiploader and Conveyor Demolition
More than 520 tonnes of redundant steel structure removed at Berth 2, clearing a safe and accessible wharf for Southern Ports.
-

Esperance Port Diesel Pipeline
A new DN350 diesel pipeline and connection pit at Esperance Port, replacing buried and under-wharf pipework with no interruption to through traffic.
-

Bandy Creek Weir Reinstatement
Bridge construction and the structural and services works for the new Bandy Creek weir at Esperance, delivered under subcontract.