Open trench with a new pipeline beside conveyors and stacked containers at Esperance Port

Esperance Port Diesel Pipeline

A new DN350 diesel pipeline and connection pit at Esperance Port, replacing buried and under-wharf pipework with no interruption to through traffic.

Client
Southern Ports Authority
Location
Esperance WA
Duration
August to October 2020
Contract
Lump sum

Esperance Port is a crucial trading hub connecting regional Western Australian industries to global markets. It is also a fuel import terminal for the Great Southern and Goldfields regions, which calls for efficient handling facilities to speed up unloading and distribution. CareyMC was engaged by Southern Ports to bring the existing services up to modern standards.

Rows of wharf piles standing in clear turquoise water under the deck

Scope of works

  • Removal of the existing diesel pipeline, including buried land-based pipework and pipework slung under the wharf
  • Installation of a new DN350 (350 mm) diesel pipeline
  • Relocation of the existing pigging station
  • A concrete connection pit, 5.4 m by 4.3 m and 1.2 m deep, with trafficable lids
  • Electrical supply and an alarm system from the pit to the Port Operations Building
  • Repair and resealing of existing hardstands

Key achievements

The project let CareyMC show its capability in complex brownfield work, where a critical part of the job is managing the interfaces between the client’s ongoing operations and project activities. Outages and the sequence of works were planned and coordinated so that through traffic was never interrupted.

The project was completed to the client’s satisfaction, with over 17% of all site hours worked by local Aboriginal people.

Workers on an access walkway under the wharf, beside the pipework The open excavation for the new pipeline across the port hardstand The concrete connection pit with pipework inside Two workers in high-visibility clothing in the pipeline trench A walkway and pipes running beneath the wharf deck Workers installing pipework under the wharf Reinforcing steel and formwork for the connection pit, with trucks behind

More projects

All civil projects
  • Road bridge over a rock-armoured channel of clear green water at Bandy Creek

    Italia Stone Group / Department of Transport · Esperance WA · Aug 2019 - Apr 2020

    Bandy Creek Weir Reinstatement

    Bridge construction and the structural and services works for the new Bandy Creek weir at Esperance, delivered under subcontract.

  • Steel truss gangway reaching out over the water to a ferry pontoon on the Tiwi Islands

    Tiwi Enterprise Pty Ltd · Tiwi Islands NT · Sept 2018 - Nov 2019

    Tiwi Islands Ferry Terminals and Visitor Centre

    A visitor centre and two ferry landings, one on each side of the Apsley Strait, delivered by two Indigenous-owned businesses.

  • Aerial view of the renewed container hardstand at Esperance port, beside the ship loader

    Southern Ports Authority · Esperance WA · 2023 · $9.25M

    Berth 2 Hardstand Renewal

    A renewed container hardstand and a 220 kL stormwater holding tank at Esperance Port, delivered while the berth stayed open.

Ground to move? Let's talk.

Talk with our Civil Team