Carey News.

Project milestones, partnerships, people and updates from across the Carey Group.

The latest from Carey

22 stories

Daniel Tucker AM accepts the Services Category Winner trophy from a presenter on stage, under a screen showing his name and Carey Group Holdings Company · Daniel Tucker AM named Services Category Winner at the EY Entrepreneur Of The Year™ 2027 Awards Carey Group founder and Managing Director Daniel Tucker AM has been named the Services Category Winner in the EY Entrepreneur Of The Year™ 2027 Awards, one of Australia's most respected business honours. Read more

Projects

11 stories

  • An AngloGold Ashanti representative and a Carey representative smile as they sign contract documents at a table

    Goldfields, WA ·

    Carey Mining awarded two multi-year contracts at Sunrise Dam

    Carey Mining is proud to announce it has been awarded two new multi-year contracts at AngloGold Ashanti’s Sunrise Dam gold mine in the northern Goldfields: a…

  • A freshly sealed highway with new line marking curves past road signs for Great Ocean Drive and Esperance

    Esperance, WA ·

    South Coast Highway upgrade

    Road widening and safety improvements at two Black Spot intersections on the main road into Esperance, for Main Roads WA.

  • Broad bulk earthworks landform stretching across red Pilbara ground

    Newman, WA ·

    OB35 Creek Diversion, TSF1 & TSF3

    A large, multi-discipline civil earthworks and drainage package for essential mine infrastructure upgrades at Newman.

  • A renovated open-plan kitchen with a long island bench, new timber-look flooring and downlights

    Newman, WA ·

    Newman housing uplift

    Renovation of residential homes for Newman-based mining staff and their families, with a 40% Indigenous workforce.

  • The bow of a large car carrier berthed at Fremantle Port, with utility vehicles and a site container on the wharf beside it

    Fremantle, WA ·

    Fremantle Port fender replacement

    Demolition and replacement of the ship fender system at H Berth, carried out at a working port.

  • Aerial view of a container ship alongside the Berth 2 hardstand at Esperance Port, with conveyors and storage sheds behind

    Esperance, WA ·

    Berth 2 hardstand renewal and first flush tank

    A renewed container hardstand and a 220 kL stormwater holding tank at Esperance Port, delivered while the berth stayed open.

  • Inside a refurbished steel-framed shed with new cladding and a mobile scaffold standing on the concrete floor

    Cocos (Keeling) Islands ·

    Cocos Islands vehicle shelter

    Repair and refurbishment of a corroded equipment shed on the Cocos (Keeling) Islands, before the asset was too far gone to salvage.

  • Aerial view of the Two Rocks foreshore: new paths and paving along the rock wall, the rainbow-roofed Birdman shelter, two jetties and the boat ramp car park

    Two Rocks, WA ·

    Two Rocks southern foreshore redevelopment

    Architectural shelters, landscaping and public amenities along more than 800 m of foreshore beside Two Rocks Marina.

  • An excavator beside a partly demolished concrete water tank on cleared red ground in low evening light

    Beverley, WA ·

    Beverley town water tank demolition

    Four redundant concrete water tanks, their asbestos piping and equipment removed for Water Corporation, and the site made ready to return to farmland.

  • Aerial view of a newly sealed heavy vehicle parking bay looping off a straight highway through red earth and scrub near Kambalda, in WA's Goldfields

    Kambalda, WA ·

    Kambalda truck parking bay and hardstand

    A new heavy vehicle parking bay and rest stop outside Kambalda for Main Roads WA, with Aboriginal engagement targets exceeded four and five times over.

  • Mobile cranes lift a conveyor gallery section at Esperance Port, with the port’s ship loader and stacked containers behind

    Esperance, WA ·

    Esperance Port shiploader and conveyor demolition

    More than 520 tonnes of redundant steel structure removed at Berth 2, clearing a safe and accessible wharf for Southern Ports.

Company

2 stories

People

2 stories

Insights

3 stories

Community

1 story

Training

2 stories

Let's create new horizons, together.

Contact Carey Group