Esperance Port, 720 km south-east of Perth, is the only deep-sea port in southern Western Australia and a gateway for many commodities. The Berth 2 Hardstand Renewal Project upgraded the berth’s infrastructure so that its environmental licence requirements are met.
Stormwater now passes through a new 220 kL holding tank, the First Flush Tank, and then a Dissolved Metals Treatment tank that removes metals and hydrocarbons before the water is released to the ocean. The project replaced the berth’s ineffective drainage system in full.
The hardstand itself was replaced as well. The existing pavement was excavated 520 mm and a new 340 mm basecourse placed and stabilised with 5% cement, a robust foundation for 180 mm of asphalt.
Scope of works
- Hardstand drainage: 225 m of 450 mm pipe, 50 m of 750 mm pipe and five reinforced concrete stormwater pits
- Pavement cement stabilisation and a 180 mm asphalt layer
- Temporary works: a 96 m sheet pile cofferdam, 12 m deep, to support construction of the tank
- Dewatering, pumping 2,500 kL a day
- Construction of the 220 kL First Flush Tank and installation of the Dissolved Metals Treatment tank
- Electrical and mechanical support
- Management of port user access throughout
Berth 2 is busy, and it was critical that it remained operational at all times. The works were sequenced in multiple stages to achieve that, to the satisfaction of Port Operations and other stakeholders.
A highlight was the recycling of the demolished asphalt and concrete. It was crushed, screened and reused to create a new laydown area for Port Operations.
Back to Carey News- Location
- Esperance, WA
- Client
- Southern Ports
- Duration
- January to September 2023
- Contract type
- Lump sum