Aerial view of a curved rock breakwater enclosing the Two Rocks marina, with the beach and town beyond

Port infrastructure contractor in WA.

Port infrastructure, delivered to the same standard.

CareyMC delivers 100% Indigenous-owned port and coastal infrastructure, from jetties and wharves to breakwaters and reclamation, across Western Australia, along with special remote projects on the Tiwi Islands (NT) and the Cocos (Keeling) Islands.

Carey delivers port infrastructure to the same standard of delivery, safety and partnership as its civil and mining work. With more than 10 years across civil and port projects, from ports and harbours to bridges, hardstands and remediation, Carey brings genuine multi-discipline capability to specialised environments.

Aerial view of a marina with floating berths, a hardstand and car parks beside the coast
Aerial view of the Two Rocks shoreline, with jetties, the boat ramp and the car park behind the rock wall
Aerial view of two jetties, the boat ramp and car park at Two Rocks marina
Worker in high-visibility clothing and harness works beside a heavy chain in a confined steel compartment
The bow of a large car carrier berthed at Fremantle Port, with utility vehicles and a site container on the wharf beside it
A crew crosses a new steel truss footbridge over a rock-lined channel
Construction corridor of excavated sand runs beside a waterfront road and marina
Road bridge over a rock-armoured channel of clear green water at Bandy Creek
Aerial view of a jetty reaching out from the rock wall at Two Rocks, with the foreshore path behind
Mobile cranes lift a conveyor gallery section at Esperance Port, with the ship loader and stacked containers behind
Aerial view of a water channel with rock-armoured banks, a crossing and access tracks through bushland
Steel truss gangway reaching out over the water to a ferry pontoon on the Tiwi Islands
Worker in a life jacket stands on a vessel deck beside a berthed bulk carrier
Fenced walkway with yellow handrails leads across a coastal industrial site towards cranes and equipment

10+ years

Civil & port infrastructure

100%

Indigenous-owned

Tier 1

Client base

Our Clients

Main Roads Western Australia Australian Government Department of Defence Fremantle Ports Southern Ports Shark Bay Salt BHP

Core Services

  1. Port infrastructure works
  2. Port infrastructure
  3. Jetty and wharf works, fixed and floating
  4. Landbacked wharves and marinas
  5. Pedestrian and simple span bridges
  6. Bearing replacements and culverts
  7. Bridge piers, revetments and groynes
  8. Breakwaters, reclamations and remediation
  9. Driven and drilled piles, sheet piling and ground anchors

Proven on the water.

Port projects along the Western Australian coast, and a special remote project on the Tiwi Islands (NT).

All civil projects
  • Steel truss gangway reaching out over the water to a ferry pontoon on the Tiwi Islands

    Carey · Tiwi Islands NT · Opened 2020

    Tiwi Island Pontoon & Visitor Centre

    Key transport infrastructure delivered for the eight Traditional Land-Owning Groups of the Tiwi Islands, with strong regional and local Indigenous procurement.

    75%of contract value delivered by Northern Territory businesses, and 15% by Tiwi Aboriginal businesses

  • Aerial view of the renewed container hardstand at Esperance port, beside the ship loader

    Southern Ports Authority · Esperance WA · 2023

    Berth 2 Hardstand & First Flush Tank

    Container hardstand renewal and stormwater treatment infrastructure delivered while keeping the berth operational.

    220 kLstormwater First Flush Tank

  • Aerial view of Bandy Creek, with rock-armoured banks either side of a crossing and bushland beyond

    Italia Stone Group / Department of Transport · Esperance WA · 2019 - 2020

    Bandy Creek Weir

    A new rock weir and separate bridge, built 50 m upstream of two earlier weirs that floods had damaged beyond repair. Under subcontract, Carey completed the bridge construction, structural and services works.

    85 mvinyl sheet pile cut-off wall, with 20 m driven tubular piles for the bridge foundations

  • The bow of a large car carrier berthed at Fremantle Port, with utility vehicles and a site container on the wharf beside it

    Fremantle Port Authority · Fremantle WA · 2023

    Fremantle Port Fender Replacement

    The end-of-life steel pylon fender system removed and a new one tied into the existing concrete deck.

    H Berthfenders replaced around ships at a live port

  • Aerial view of the Two Rocks foreshore: new paths along the rock wall, the rainbow-roofed Birdman shelter, two jetties and the boat ramp car park

    Department of Transport · Two Rocks WA · 2022

    Two Rocks Southern Foreshore

    New footpaths, parking, underground services, public amenities and the Birdman shelter beside the marina.

    800 mof foreshore rebuilt with public access kept open

  • Mobile cranes lift a conveyor gallery section at Esperance Port, with the ship loader and stacked containers behind

    Southern Ports Authority · Esperance WA · 2021

    Esperance Port Shiploader Demolition

    A redundant minerals shiploader and its conveyor galleries dismantled without holding up shipping.

    520 tof fabricated steel structures removed at Berth 2

Certifications

  • Federal Safety Commissioner

    WHS Accreditation Scheme

  • ISO 9001:2015

    Quality certified

  • ISO 45001:2018

    Safety certified

  • ISO 14001:2015

    Environmentally certified

Registered buildersRegistered architectsClass 1 demolition licenceClass B asbestos removalLicensed security installers

Ground to move? Let's talk.

Talk with our Civil Team