Aerial view of the Sunrise Dam open pit, its benches spiralling down, with red country running to the horizon

Mining and rehabilitation projects across WA.

Where the horizon has already changed.

Carey Mining has delivered open-pit mining, exploration earthworks and mine rehabilitation across WA's Goldfields, Pilbara and Kimberley, supported by long-term client relationships, strong safety performance and genuine Indigenous participation.

Our Clients

AngloGold Ashanti Lynas Rare Earths Fortescue BHP Rio Tinto

Projects

Excavator lifts a full bucket over a haul truck beside a pit wall

Mt Weld: Rare Earths Mining

Lynas Rare Earths · Goldfields WA · Full-service open-pit contractor

A five-year mining services contract on one of the most significant rare-earths assets in the world, a key upstream input to the global rare-earths value chain.

  • 2.3 million BCMmined per year
  • Full-service open-pit contractor: load and haul, drill and blast, road maintenance
  • 9%Aboriginal employees
  • Around 50ongoing roles created as the operation moved to continuous mining
An excavator loads a Carey haul truck in a dusty open pit, with a second excavator working behind

Sunrise Dam: Open-Pit Mining and Ore Handling

AngloGold Ashanti · Goldfields WA · Since 1996

A relationship spanning roughly 30 years across open-pit mining and surface ore handling, extended from pit to pit, evidence of consistent delivery and lasting client trust.

  • 3.6 million BCMmined per year (open pit)
  • Around 6 Mtpasurface ore handling: ROM feed and ore rehandle
  • 3.4TRIFR
  • 13%Aboriginal employees

Further projects

Aerial view of an open-pit waste mining area in red and white ground, with excavators and haul trucks working on the benches

Thunderbird: Major Waste Mining

Kimberley Mineral Sands · Kimberley WA · Completed (May 2023 to Feb 2025)

Major waste mining at the Thunderbird mineral sands project: site establishment, load and haul, and rehandle. The contract covered free digging, ripping, excavation, loading and hauling of waste material.

  • 4.9 million BCMwaste mined and rehandled
  • 29%Aboriginal employment
  • Completed: Waste Mining Services Agreement, 1 May 2023 to 24 February 2025
Aerial view of an excavator loading a haul truck on a pale pit floor criss-crossed with wheel tracks

Hermes: Open-Pit Mining

Billabong Gold · Goldfields WA · Completed 2019

Full-service open-pit mining contract completed with an exemplary safety and participation record.

  • Over 8 million BCMmined over 24 months, plus additional works at Plutonic East
  • 0TRIFR for the project
  • 0LTI for the project
  • 25%Aboriginal employment, including local Jidi Jidi Traditional Owner trainees
A large bulldozer on freshly worked red ground, with low hills and scrub behind

Mining Area C: Exploration Earthworks

BHP · Pilbara WA · 2006 to 2026

Long-running exploration earthworks, drill pad preparation and rehabilitation.

  • 20 yearswithout a single lost time injury
  • Up to 35%Aboriginal employees at peak
A grader works a cleared red track through low scrub and spinifex, raising dust

Iron Bridge and Christmas Creek: Exploration Earthworks

Fortescue · Pilbara WA · Since 2019

Exploration earthworks, drill pad preparation and rehabilitation across Fortescue's Iron Bridge, Solomon, Cloudbreak and Christmas Creek operations.

  • Access preparation, road and track maintenance, drill pad construction, clearing and rehabilitation
  • Zero lost time injuries since work began in 2019
Aerial view of a reshaped and rehabilitated mine landform beside an old pit, with green country beyond

GNA Nimingarra: Rehabilitation

BHP · Pilbara WA · Nov 2020-Mar 2022

Phase 2 of the Goldsworthy Northern Area rehabilitation programme, delivering mine closure across four separable portions.

  • Roughly 98 hectaresrehabilitated, topsoil spread and seeded
  • Overburden stockpile re-profiling, pit backfill and landform design
  • Over 7.5 kmof 2m abandonment bunds constructed
  • Delivered in partnership with Traditional Owners to meet Indigenous participation commitments
Excavators, a loader and light vehicles work across a wide red earthworks pad, with two workers on foot and ranges on the horizon

Nammuldi: Below Water Table Earthworks

Rio Tinto · Pilbara WA · 2011-2013

Earthworks and miscellaneous services enabling a mine-life extension, delivered in close coordination with other contractors on constrained work areas.

  • 14 hectaresof clearing and topsoil stripping
  • 75,000 m³cut to fill
  • Drainage, stormwater and grouted rip rap works
  • 8 hectaresof site rehabilitation
  • Success here led to further award at Brockman 2