Sunrise Dam: Open-Pit Mining and Ore Handling

A relationship spanning roughly 30 years across open-pit mining and surface ore handling, extended from pit to pit, evidence of consistent delivery and lasting client trust.

Client
AngloGold Ashanti
Location
Sunrise Dam Gold Mine
Region
Goldfields WA
Commodity
Gold
Since
1996
Scope
Open-pit mining and surface ore handling

Carey has been operating at Sunrise Dam Gold Mine since 1996, a partnership with AngloGold Ashanti spanning roughly 30 years and extended from pit to pit.

This long-standing relationship reflects Carey's commitment to consistent delivery and lasting client partnerships.

A Carey worker in high-visibility clothing looks out over the Sunrise Dam open pit from its rim

Scope of work

  • Open-pit mining
  • Surface ore handling

Milestones

  1. 1996Carey begins its continuous operation at Sunrise Dam, which continues today.
  2. 2004The Minerals Council of Australia gives Carey the MINEX Award for promoting a culture of continuous improvement at Sunrise Dam.
  3. 2020Carey is awarded the full mining contract for the Golden Delicious open pit.
  4. 2025Carey secures two multi-year contracts: open-pit mining to November 2028, and surface ore haulage to January 2028.

Key outcomes

  • Since 1996A continuous relationship, roughly 30 years, extended pit to pit
  • 3.6 million BCMmined per year (open pit)
  • Around 6 Mtpasurface ore handling: ROM feed and ore rehandle
  • 3.4TRIFR
  • 13%Aboriginal employees
Aerial view of a deep open pit with terraced benches and ramps descending to the pit floor Worker in high-visibility clothing and hard hat stands with arms folded while a haul truck is loaded behind him Aerial view of a haul truck climbing the ramp out of the open pit Wheel loader fills a haul truck on a pale dusty stockpile area under an overcast sky A Carey haul truck faces the camera on the pit floor with a second truck behind it Aerial view of haul trucks and a Carey water cart parked on red ground Road train side tipper truck drives across dusty mine ground Wheel loader pushes a pile of broken rock, throwing up dust Two workers stand in front of the Carey workshop on site Looking down into the deep open pit, its benches and ramps in shadow

More projects

All mining projects
Excavator lifts a full bucket over a haul truck beside a pit wall

Mt Weld: Rare Earths Mining

Rare earths ยท Goldfields

A five-year mining services contract supporting Lynas' transition to continuous mining.