Kambalda truck parking bay and hardstand

A new heavy vehicle parking bay and rest stop outside Kambalda for Main Roads WA, with Aboriginal engagement targets exceeded four and five times over.

Aerial view of a newly sealed heavy vehicle parking bay looping off a straight highway through red earth and scrub near Kambalda, in WA's Goldfields

In December 2021 CareyMC was awarded the work order to construct a heavy vehicle parking bay just outside Kambalda. Small in scale, it still involved most aspects of road construction: embankment foundation earthworks, drainage, pavement construction, sealing, and signs and lines.

Because of the site’s geometry and drainage requirements, the embankment for the bay was built up by 1.3 m, which meant importing 22,000 tonnes of gravel from the Spargoville pit.

The challenges

The project was delivered while COVID-19 was prevalent in the community, and the team took the precautions that required. The Kambalda to Esperance gas pipeline also ran through the middle of the work area: inspectors had to be present whenever work came within 10 m of the line, and compaction was restricted.

Aboriginal engagement

The work order set targets for Aboriginal engagement, and both were significantly exceeded. Aboriginal employment reached 40.9% against a target of 10%, and engagement of Aboriginal businesses reached 50.1% against a target of 10%.

All critical safety and quality requirements were met.

Back to Carey News
Location
Kambalda, WA
Client
Main Roads WA
Duration
December 2021 to May 2022
Aboriginal employment
40.9% (target 10%)
Aboriginal business
50.1% (target 10%)