Projects ·

Beverley town water tank demolition

Four redundant concrete water tanks, their asbestos piping and equipment removed for Water Corporation, and the site made ready to return to farmland.

An excavator beside a partly demolished concrete water tank on cleared red ground in low evening light

Water Corporation required the removal of four redundant water storage tanks and their associated pipes and equipment, including asbestos pipes.

Scope of works

  • Demolition of two 225 m³ concrete tanks
  • Demolition of one 1,125 m³ concrete tank
  • Demolition of one 615 m³ concrete tank
  • Removal of asbestos pipes, with air monitoring
  • Removal of piping, pumps and associated equipment

The redundant services had to be removed around others that were still operating, and the two were often entangled. Carey completed the work quickly and with no damage to the remaining assets.

The concrete was crushed to remove the steel reinforcing, and both the crushed concrete and the steel were recycled. The site was cleared of all debris, levelled and rehabilitated, ready for remediation to farmland.

The project was completed two weeks ahead of schedule and to the satisfaction of Water Corporation.

Back to Carey News
Location
Beverley, WA
Client
Water Corporation
Duration
30 days
Contract
$600,000, lump sum
Result
Two weeks ahead of schedule

Let's create new horizons, together.

Contact Carey Group