Esperance Port is a pivotal trading hub connecting regional Western Australian industries to global markets. With shipping methods modernising and upgrades planned, the long redundant 4,000 tonne-per-hour minerals shiploader and conveyor system at Berth 2 had to be removed. CareyMC was engaged by Southern Ports to undertake this Class 1 demolition project.
Scope of work
- Removal of the existing berth face shiploader
- Removal of the feed conveyor galleries and transfer towers
- Strengthening of gallery trestles to support the sulphur import system, which was retained
The project demolished more than 520 tonnes of fabricated steel structures, some of them over 28 m high.
Key achievements
Keeping the sulphur import system in service let CareyMC show its capability in shutdown work on conveyor systems. The conveyor was shortened and a new tail-end gallery installed, all within tight permitted outages.
The team worked closely with Port Operations so that neither shipping nor the project was held up. Disruptive works were planned around the shipping schedule, and detailed traffic management plans kept landside transport moving at the port.
Back to Carey News- Location
- Esperance, WA
- Client
- Southern Ports
- Duration
- July to October 2021
- Contract type
- Lump sum
- Steel removed
- 520 tonnes