Fenced concrete compound with a security gate on red ground

Karratha TAFE Secure Vehicle Compound

A secure compound for 20 fleet vehicles and a bus, designed and built with concrete pavement, security fencing, automatic gates, lighting and swipe card access.

Client
Department of Finance, Building Management and Works
Location
Karratha WA
Duration
July to November 2016
Contract
Design and construct

Carey was awarded the contract to design and construct a secure vehicle compound at Karratha TAFE, providing safe parking for 20 fleet vehicles and a bus. Carey managed the full scope, providing both design and site management throughout.

A concrete pour under way for the compound pavement, with a pump boom overhead

Scope of works

  • Design: complete design of the facility to stakeholder requirements, City of Karratha local by-laws, the Building Code of Australia and applicable Australian Standards
  • Materials: supply of road base and fill, including sub-base and base course
  • Site preparation: earthworks, compaction and drainage
  • Pavement: concrete pavement with dowelled and keyed construction joints throughout
  • Electrical: a new distribution board connecting the facility to the existing site supply
  • Security: CCTV, security lighting, access systems, security fencing and automatic gates with swipe card access

Delivery

Carey supported the Karratha business community by engaging local subcontractors throughout. Its integrated project management systems and hands-on involvement at every stage delivered the works on time and to the client’s specifications.

The finished concrete pavement inside the security fence The compound and gate seen from outside, on red ground A roller compacting the base course on site The compound fence beside the TAFE buildings Earthmoving plant working on the base course Close view of the security fence, gate post and barbed wire

More projects

All civil projects
  • Broad bulk earthworks landform stretching across red Pilbara ground

    BHP · Pilbara WA · 2023 - 2024 · Multi-discipline

    OB35 Creek Diversion, TSF1 & TSF3

    A large, multi-discipline civil earthworks and drainage package for essential mine infrastructure upgrades at Newman.

  • Aerial view of the bitumen terminal under construction, with storage tanks, a concrete slab and scaffolding

    Colas Australia · Kwinana WA · Jul 2017 - Mar 2018

    Sami Bitumen Terminal

    A complete civil and building package for a new bitumen import and processing terminal in the Fremantle Ports area, won in an open competitive tender.

  • Aerial view of the Two Rocks foreshore: new paths along the rock wall, the rainbow-roofed Birdman shelter, two jetties and the boat ramp car park

    Department of Transport · Two Rocks Marina WA · Feb - Oct 2022

    Two Rocks Southern Foreshore Redevelopment

    Architectural shelters, landscaping and public amenities along more than 800 m of foreshore beside Two Rocks Marina.

Ground to move? Let's talk.

Talk with our Civil Team