Sami Bitumen Terminal
A complete civil and building package for a new bitumen import and processing terminal in the Fremantle Ports area, won in an open competitive tender.
- Client
- Colas Australia
- Location
- Kwinana WA
- Duration
- July 2017 to March 2018
- Contract
- Lump sum
To better service the Western Australian market, Sami Bitumen Technologies, a member of the French Colas Group, needed a second import and processing terminal in the Fremantle Ports area to support its existing operations in North Fremantle. Following an open competitive tender, Carey was awarded the contract to manage the construction of civil infrastructure and buildings at the new Kwinana site.
More than 1,000 m³ of concrete was poured. Carey staff helped the design consultants and the owner resolve and rationalise constructability details, which reduced the overall concrete needed.

1,000+ m³
Of concrete
Poured across the site
Six
Disciplines in one package
Earthmoving, concrete, steel, HVAC, electrical and plumbing
Lump sum
Contract
July 2017 to March 2018
Scope of works
- Management of asbestos-contaminated materials on the site
- Underground service culverts, conduits and draw pits
- A site drainage system, including infiltration ponds, flush pits, manholes and pipework
- Concrete foundations, slabs and bund walls
- Fabrication and installation of loading gantry steelwork
- Construction and fit-out of the mechanical control centre building
Why it mattered
The project let Carey show its capability in managing complex, multi-discipline work, with trades ranging from earthmoving, concrete and steel construction to heating, ventilation and air conditioning, electrical and plumbing.
It also advanced Indigenous participation: one of Carey’s Indigenous trainee labourers furthered his career with funding for a non-slewing crane operator licence.
Gallery
More projects
-

Two Rocks Southern Foreshore Redevelopment
Architectural shelters, landscaping and public amenities along more than 800 m of foreshore beside Two Rocks Marina.
-

Esperance Port Diesel Pipeline
A new DN350 diesel pipeline and connection pit at Esperance Port, replacing buried and under-wharf pipework with no interruption to through traffic.
-

Bandy Creek Weir Reinstatement
Bridge construction and the structural and services works for the new Bandy Creek weir at Esperance, delivered under subcontract.