OB35 Creek Diversion, TSF1 & TSF3
A large, multi-discipline civil earthworks and drainage package for essential mine infrastructure upgrades at Newman.
- Location
- Newman, Pilbara WA
- Client
- BHP
- Period
- 2023 to 2024
- Scope
- Multi-discipline
- Fill placed
- 400,000 m³
The OB35, TSF1 wall lift and TSF3 buttress works brought together a tailings dam lift, pipeworks, electrical and instrumentation works, culvert supply and installation, concrete works, steel fabrication and bulk earthworks.

Zero
TRIFR
And zero non-conformances
100%
Delivered
400,000 m³
Approved fill placed
For the TSF3 buttress
OB35 Creek Diversion
- A flood protection bund, including installation and trimming of safety berms
- Six-barrel, 1.2 m diameter corrugated steel pipe culverts, with a section of haul road over them
- Bulk excavation and construction of a 235 m land bridge in the diversion channel at the Overburden Storage Area
- The downstream and upstream ends of the creek diversion, including riprap sorting and placement
TSF1 wall raise
- A 3 m raise of the existing TSF1 wall, with access ramps, a new decant access causeway and surface water treatment
- Decant pontoon design and construction, pumps and equipment
- Replacement of about 920 m of HDPE tailings delivery pipeline, with works completed during a shutdown
- Installation of motor, pump and valves
- Removal and replacement of 1,600 m of Victaulic tailings deposition pipe and 800 m of HDPE decant return pipe
- Electrical infrastructure: power poles, communications, CCTV, instrumentation and control
TSF3 buttress
Removal of vegetation, then construction of the buttress wall and a saddle dam using 400,000 m³ of approved fill from the Overburden Storage Area.
With limited workfront across the three areas, contractors had to work at the same time on the different packages and complete specific structural, mechanical and piping works during the shutdown period.
The work was awarded to Carey on the strength of similar bulk earthworks packages completed before it, a strong safety record and the capability of the Carey management team.
Gallery
More projects
-

Sami Bitumen Terminal
A complete civil and building package for a new bitumen import and processing terminal in the Fremantle Ports area, won in an open competitive tender.
-

Two Rocks Southern Foreshore Redevelopment
Architectural shelters, landscaping and public amenities along more than 800 m of foreshore beside Two Rocks Marina.
-

Esperance Port Diesel Pipeline
A new DN350 diesel pipeline and connection pit at Esperance Port, replacing buried and under-wharf pipework with no interruption to through traffic.