Inside a refurbished steel-framed shed with new cladding and a mobile scaffold standing on the concrete floor

Cocos Islands Vehicle Shelter

Repair and refurbishment of a corroded equipment shed on the Cocos (Keeling) Islands, before the asset was too far gone to salvage.

Location
Cocos (Keeling) Islands
Work
Repair and refurbishment
Materials
Supplied from Fremantle

The tropical coastal environment of the Cocos (Keeling) Islands is highly corrosive: salt and high humidity mean standard building materials last only a few years. Buildings need constant repair and high quality materials, and the cost of construction makes it a necessity to reuse and recycle wherever possible.

One example is an equipment shed with significant corrosion to its cladding and structure. Carey was engaged to repair and refurbish the shed before it was too corroded to save.

New galvanised steel framing going up beside palm trees

Scope of works

  • Check engineering of the structure and the proposed alterations to suit a cyclonic region
  • Stripping all roof and wall cladding and removing obsolete fixtures, fittings and old equipment
  • Cleaning and repainting the structural steel and any secondary steel that could be reused
  • Applying specialised corrosion protection to the steel
  • Replacing damaged parts of the building with modern materials to suit the climate and location
  • Enclosing the building on all sides, with new access doors
  • Supplying all materials from Fremantle so they were on hand when required

The challenges

  • Quality control and testing of concrete to a strict engineering specification, on a remote island with basic equipment
  • Planning and delivering renovation work in a remote location where the full extent of the work was not known at the start
  • Minimising waste and maximising the reuse of materials, to extend the building’s life and save on waste transport
  • Selecting materials to withstand the harsh tropical coastal environment
The stripped steel frame of the shed, cleaned and ready for cladding The shed frame with new roof purlins under a bright sky The steel frame seen from the side during refurbishment Looking up through new galvanised roof framing A worker on a mobile scaffold fixing steelwork The old shed before the works, dark and weathered A precast concrete block being lifted into place

More projects

All civil projects
  • Refitted dental surgery with a blue chair, new cabinetry and vinyl flooring

    Department of Infrastructure · Cocos (Keeling) Islands · Sept - Oct 2020

    Cocos Islands Dental Clinic

    A turn-key refit of the dental clinic at the Home Island Medical Centre, with specialist cabinetry, upgraded services and recommissioned dental equipment.

  • Refurbished room with fresh white walls and an open blue door

    Jones Lang LaSalle (WA) · West Island and Home Island, Cocos (Keeling) Islands · Jan - Feb 2020

    Cocos Islands High School Asbestos Removal and Refurbishment

    Asbestos-contaminated former toilets at both school campuses turned into storerooms, on a fast turnaround.

  • Two cream transportable buildings with dark window shutters, set on a new concrete path and fresh mulch among gum trees

    Department of Health · Mandurah WA · Dec 2019 - Mar 2020

    Peel Health Campus Transportable Buildings

    Eight offices, two universal access toilets and a storeroom, fabricated as transportable buildings and installed at the Peel region’s major hospital.

Ground to move? Let's talk.

Talk with our Civil Team