Precast concrete interpretation node with a boulder set into it, on the heritage trail

Adenia Park Heritage Trail

An interpretation trail with an extended concrete path, four sandblasted interpretation nodes and four precast concrete benches, telling the history of the Sikh community and the Whadjuk People.

Client
Parks and Wildlife Service
Location
Adenia Park, Riverton WA
Duration
January to March 2018
Contract
Lump sum

The City of Canning worked with the Department of Biodiversity, Conservation and Attractions and the Australian Sikh Heritage Association to develop a heritage trail at Adenia Park. The park is very significant to the Australian Sikh community: it was the site of the first legal cremations in Western Australia, after the community campaigned for cremation to be legalised.

The works contracted to Carey were an interpretation trail that tells the history of the Sikh community and gives information about the Whadjuk People and the local environment. Carey won the work through a competitive tender.

Scope of works

  • All required earthworks
  • An extension to the existing concrete path to create the new interpretation trail
  • Four interpretation nodes, including architectural sandblasting
  • Fabrication and installation of four precast concrete benches with timber inset
  • Management of potential asbestos-contaminated materials

Training and opening

As well as creating jobs for Indigenous Australians, Carey provided training for young Indigenous students completing their Certificate II in Construction, giving them hands-on experience towards their course.

The trail was officially opened on 17 April 2018, with a Welcome to Country by Whadjuk Elder Marie Taylor and an address by the Minister for Environment, the Hon. Stephen Dawson MLC, who made specific mention of Carey’s contribution and of the environmental, cultural and economic benefits of the Carey delivery model.

Formwork and fresh concrete for the new path, under shade trees A newly poured section of the concrete path running through the park

More projects

All civil projects
  • Lined pond filled with water beside sheds at an industrial terminal

    Bis Industries · Kwinana WA · Sept - Nov 2017

    Bis Industries Kwinana Terminal Drainage and Lined Pond

    An evaporation basin converted into a lined water treatment pond, with new site drainage, while the bulk cargo terminal kept operating around the works.

  • Fenced concrete compound with a security gate on red ground

    Department of Finance, Building Management and Works · Karratha WA · Jul - Nov 2016

    Karratha TAFE Secure Vehicle Compound

    A secure compound for 20 fleet vehicles and a bus, designed and built with concrete pavement, security fencing, automatic gates, lighting and swipe card access.

  • Broad bulk earthworks landform stretching across red Pilbara ground

    BHP · Pilbara WA · 2023 - 2024 · Multi-discipline

    OB35 Creek Diversion, TSF1 & TSF3

    A large, multi-discipline civil earthworks and drainage package for essential mine infrastructure upgrades at Newman.