South Coast Highway Upgrade
Road widening and safety improvements at two Black Spot intersections on the main road into Esperance, for Main Roads WA.
- Location
- Esperance, WA
- Client
- Main Roads WA
- Duration
- 2 months
- Contract value
- $2 million
- Indigenous workforce
- 20%
Main Roads Western Australia’s Black Spot Program identifies high-risk intersections across the Great Southern and funds cost-effective treatments to reduce the risk to road users. The intersections of Bukererup Road and Collier Road on South Coast Highway, a major arterial route into Esperance, were identified as needing attention.

20%
Indigenous workforce
Six
Indigenous people directly employed
60% with little or no road construction experience
$2 million
Contract value
2 months
On site
Finished before winter
Scope of works
- Survey set out and demarcation of the clearing boundary, including dieback-infested areas
- Clearing and mulching of vegetation, with careful removal and disposal of dieback material
- Cutting the asphalt and excavating the existing pavement down to the foundation
- Road reconstruction and widening: foundation and embankment shaping, subgrade preparation, subbase, base course and new shoulders
- A two-coat asphalt primeseal (14 mm and 7 mm stone)
- Line and audio marking, and new directional and regulatory signs
The challenges
Live traffic kept flowing on a busy arterial road throughout construction. The schedule was tight, with the works to be finished before winter, and labour was hard to secure both locally and across the construction industry at the time.
The project had a 20% Indigenous workforce, directly employing six Indigenous people, 60% of whom had little or no previous experience in road construction.
The project was completed to a high standard and within budget.
Gallery
More projects
-

Kambalda Truck Parking and Hardstand
A new heavy vehicle parking bay and rest stop outside Kambalda for Main Roads WA, with Aboriginal engagement targets exceeded four and five times over.
-

Outback Highway, Great Central Road
An alliance with Main Roads WA and Central Earthmoving to seal the first 40 km of the Great Central Road east of Laverton, part of the 2,700 km Outback Way.
-

Beverley Town Water Tank Demolition
Four redundant concrete water tanks, their asbestos piping and equipment removed for Water Corporation, and the site made ready to return to farmland.