A freshly sealed highway with new line marking curves past road signs for Great Ocean Drive and Esperance

South Coast Highway Upgrade

Road widening and safety improvements at two Black Spot intersections on the main road into Esperance, for Main Roads WA.

Location
Esperance, WA
Client
Main Roads WA
Duration
2 months
Contract value
$2 million
Indigenous workforce
20%

Main Roads Western Australia’s Black Spot Program identifies high-risk intersections across the Great Southern and funds cost-effective treatments to reduce the risk to road users. The intersections of Bukererup Road and Collier Road on South Coast Highway, a major arterial route into Esperance, were identified as needing attention.

Graders working along the widened shoulder beside live traffic

20%

Indigenous workforce

Six

Indigenous people directly employed

60% with little or no road construction experience

$2 million

Contract value

2 months

On site

Finished before winter

Scope of works

  • Survey set out and demarcation of the clearing boundary, including dieback-infested areas
  • Clearing and mulching of vegetation, with careful removal and disposal of dieback material
  • Cutting the asphalt and excavating the existing pavement down to the foundation
  • Road reconstruction and widening: foundation and embankment shaping, subgrade preparation, subbase, base course and new shoulders
  • A two-coat asphalt primeseal (14 mm and 7 mm stone)
  • Line and audio marking, and new directional and regulatory signs

The challenges

Live traffic kept flowing on a busy arterial road throughout construction. The schedule was tight, with the works to be finished before winter, and labour was hard to secure both locally and across the construction industry at the time.

The project had a 20% Indigenous workforce, directly employing six Indigenous people, 60% of whom had little or no previous experience in road construction.

The project was completed to a high standard and within budget.

The rebuilt intersection with new signs and line marking The new gravel base course laid and compacted A grader shapes the shoulder behind traffic cones The widened shoulder beside the highway, with traffic control ahead

More projects

All civil projects
  • Aerial view of a newly sealed heavy vehicle parking bay looping off a straight highway through red earth and scrub near Kambalda, in WA's Goldfields

    Main Roads WA · Kambalda WA · Dec 2021 - May 2022

    Kambalda Truck Parking and Hardstand

    A new heavy vehicle parking bay and rest stop outside Kambalda for Main Roads WA, with Aboriginal engagement targets exceeded four and five times over.

  • A freshly sprayed seal runs straight through red country and bush, with a bitumen sprayer working in the distance

    Main Roads WA (Wongutha Way Alliance) · Laverton WA · Dec 2019 - Sept 2021

    Outback Highway, Great Central Road

    An alliance with Main Roads WA and Central Earthmoving to seal the first 40 km of the Great Central Road east of Laverton, part of the 2,700 km Outback Way.

  • An excavator beside a partly demolished concrete water tank on cleared red ground in low evening light

    Water Corporation · Beverley WA · Aug 2022

    Beverley Town Water Tank Demolition

    Four redundant concrete water tanks, their asbestos piping and equipment removed for Water Corporation, and the site made ready to return to farmland.

Ground to move? Let's talk.

Talk with our Civil Team