Beverley Town Water Tank Demolition

Four redundant concrete water tanks, their asbestos piping and equipment removed for Water Corporation, and the site made ready to return to farmland.

Location
Beverley, WA
Client
Water Corporation
Duration
30 days
Contract
$600,000, lump sum
Result
Two weeks ahead of schedule

Water Corporation required the removal of four redundant water storage tanks and their associated pipes and equipment, including asbestos pipes.

A concrete water tank partly demolished, an excavator with a breaker working over the rubble

Four

Concrete tanks demolished

From 225 m³ to 1,125 m³

2 weeks

Ahead of schedule

$600,000

Contract value

Lump sum

30 days

On site

Scope of works

  • Demolition of two 225 m³ concrete tanks
  • Demolition of one 1,125 m³ concrete tank
  • Demolition of one 615 m³ concrete tank
  • Removal of asbestos pipes, with air monitoring
  • Removal of piping, pumps and associated equipment

Delivery

The redundant services had to be removed around others that were still operating, and the two were often entangled. Carey completed the work quickly and with no damage to the remaining assets.

The concrete was crushed to remove the steel reinforcing, and both the crushed concrete and the steel were recycled. The site was cleared of all debris, levelled and rehabilitated, ready for remediation to farmland.

The project was completed two weeks ahead of schedule and to the satisfaction of Water Corporation.

An excavator bucket above the circular base of a demolished tank The cleared and levelled site after demolition, with farmland beyond

More projects

All civil projects
  • Mobile cranes lift a conveyor gallery section at Esperance Port, with the ship loader and stacked containers behind

    Southern Ports Authority · Esperance WA · Jul - Oct 2021

    Esperance Port Shiploader and Conveyor Demolition

    More than 520 tonnes of redundant steel structure removed at Berth 2, clearing a safe and accessible wharf for Southern Ports.

  • The bow of a large car carrier berthed at Fremantle Port, with utility vehicles and a site container on the wharf beside it

    Fremantle Port Authority · Fremantle Port WA · Jul - Oct 2023

    Fremantle Port Fender Replacement

    Demolition and replacement of the ship fender system at H Berth, carried out at a working port.

  • Inside a refurbished steel-framed shed with new cladding and a mobile scaffold standing on the concrete floor

    Cocos (Keeling) Islands

    Cocos Islands Vehicle Shelter

    Repair and refurbishment of a corroded equipment shed on the Cocos (Keeling) Islands, before the asset was too far gone to salvage.

Ground to move? Let's talk.

Talk with our Civil Team