Beverley Town Water Tank Demolition
Four redundant concrete water tanks, their asbestos piping and equipment removed for Water Corporation, and the site made ready to return to farmland.
- Location
- Beverley, WA
- Client
- Water Corporation
- Duration
- 30 days
- Contract
- $600,000, lump sum
- Result
- Two weeks ahead of schedule
Water Corporation required the removal of four redundant water storage tanks and their associated pipes and equipment, including asbestos pipes.

Four
Concrete tanks demolished
From 225 m³ to 1,125 m³
2 weeks
Ahead of schedule
$600,000
Contract value
Lump sum
30 days
On site
Scope of works
- Demolition of two 225 m³ concrete tanks
- Demolition of one 1,125 m³ concrete tank
- Demolition of one 615 m³ concrete tank
- Removal of asbestos pipes, with air monitoring
- Removal of piping, pumps and associated equipment
Delivery
The redundant services had to be removed around others that were still operating, and the two were often entangled. Carey completed the work quickly and with no damage to the remaining assets.
The concrete was crushed to remove the steel reinforcing, and both the crushed concrete and the steel were recycled. The site was cleared of all debris, levelled and rehabilitated, ready for remediation to farmland.
The project was completed two weeks ahead of schedule and to the satisfaction of Water Corporation.
Gallery
More projects
-

Esperance Port Shiploader and Conveyor Demolition
More than 520 tonnes of redundant steel structure removed at Berth 2, clearing a safe and accessible wharf for Southern Ports.
-

Fremantle Port Fender Replacement
Demolition and replacement of the ship fender system at H Berth, carried out at a working port.
-

Cocos Islands Vehicle Shelter
Repair and refurbishment of a corroded equipment shed on the Cocos (Keeling) Islands, before the asset was too far gone to salvage.