Kambalda Truck Parking and Hardstand
A new heavy vehicle parking bay and rest stop outside Kambalda for Main Roads WA, with Aboriginal engagement targets exceeded four and five times over.
- Location
- Kambalda, WA
- Client
- Main Roads WA
- Duration
- December 2021 to May 2022
- Aboriginal employment
- 40.9% (target 10%)
- Aboriginal business
- 50.1% (target 10%)
In December 2021 CareyMC was awarded the work order to construct a heavy vehicle parking bay just outside Kambalda. Small in scale, it still involved most aspects of road construction: embankment foundation earthworks, drainage, pavement construction, sealing, and signs and lines.
Because of the site’s geometry and drainage requirements, the embankment for the bay was built up by 1.3 m, which meant importing 22,000 tonnes of gravel from the Spargoville pit.

40.9%
Aboriginal employment
Against a target of 10%
50.1%
Aboriginal business engagement
Against a target of 10%
22,000 t
Gravel imported
From the Spargoville pit
1.3 m
Embankment raise
For site geometry and drainage
The challenges
The project was delivered while COVID-19 was prevalent in the community, and the team took the precautions that required. The Kambalda to Esperance gas pipeline also ran through the middle of the work area: inspectors had to be present whenever work came within 10 m of the line, and compaction was restricted.
Aboriginal engagement
The work order set targets for Aboriginal engagement, and both were significantly exceeded. Aboriginal employment reached 40.9% against a target of 10%, and engagement of Aboriginal businesses reached 50.1% against a target of 10%.
All critical safety and quality requirements were met.
Gallery
More projects
-

Outback Highway, Great Central Road
An alliance with Main Roads WA and Central Earthmoving to seal the first 40 km of the Great Central Road east of Laverton, part of the 2,700 km Outback Way.
-

South Coast Highway Upgrade
Road widening and safety improvements at two Black Spot intersections on the main road into Esperance, for Main Roads WA.
-

Esperance Port Shiploader and Conveyor Demolition
More than 520 tonnes of redundant steel structure removed at Berth 2, clearing a safe and accessible wharf for Southern Ports.