Security fence and gates along a road, with a CareyMC project sign in front

Cocos (Keeling) Islands Defence Works

New landside facilities for the Royal Australian Air Force at West Island Airport, one of Australia’s most remote locations.

Client
Department of Defence
Location
West Island Airport, Cocos (Keeling) Islands
Duration
October 2017 to November 2018
Contract
Lump sum

The Cocos (Keeling) Islands, 3,000 km off Australia’s west coast, are among the country’s most remote and isolated places, and strategically important to the Defence Force. The airfield supports numerous Air Force operations, and its landside infrastructure had been identified as needing upgrades.

Carey was awarded the contract to build the new facilities under competitive tender, through the Federal Government’s Indigenous Procurement Policy arrangements.

A Carey-branded container is lifted by crane over the ocean

Scope of works

  • Demolition and disposal of existing buildings and facilities
  • A new flight line building, a modular building made of nine 20-foot shipping containers, constructed and fitted out
  • A new oxygen bottle storage facility in precast concrete tilt-up panels
  • A new ground support equipment warehouse, steel framed and clad
  • A new vehicle shelter, steel framed and clad
  • Repairs to air-conditioning systems on existing Defence buildings on the island
  • Modifications to site power, water and sewerage services
  • Brick pavements across the site and secure perimeter fencing
The new flight line building, made from shipping containers, on brick paving Inside the new steel-framed warehouse, with roller doors A meeting room with white tables and black chairs inside the new building Fresh line marking on the brick paving outside the new building

More projects

All civil projects
  • Lined pond filled with water beside sheds at an industrial terminal

    Bis Industries · Kwinana WA · Sept - Nov 2017

    Bis Industries Kwinana Terminal Drainage and Lined Pond

    An evaporation basin converted into a lined water treatment pond, with new site drainage, while the bulk cargo terminal kept operating around the works.

  • Two workers in blue protective suits use a powered auger on sandy ground beside the ocean

    Jones Lang LaSalle (WA) · West Island, Cocos (Keeling) Islands · Mar 2019

    Cocos Playgroup Asbestos Removal

    A playpark closed for more than 12 months by asbestos in its sandpit, remediated and reopened for the West Island playgroup.

  • Fenced concrete compound with a security gate on red ground

    Department of Finance, Building Management and Works · Karratha WA · Jul - Nov 2016

    Karratha TAFE Secure Vehicle Compound

    A secure compound for 20 fleet vehicles and a bus, designed and built with concrete pavement, security fencing, automatic gates, lighting and swipe card access.

Ground to move? Let's talk.

Talk with our Civil Team