Two workers in blue protective suits use a powered auger on sandy ground beside the ocean

Cocos Playgroup Asbestos Removal

A playpark closed for more than 12 months by asbestos in its sandpit, remediated and reopened for the West Island playgroup.

Client
Jones Lang LaSalle (WA)
Location
West Island, Cocos (Keeling) Islands
Duration
March 2019
Contract
Lump sum

After delivering the Australian Federal Police building works on the Cocos (Keeling) Islands for JLL, Carey was engaged to remediate the playpark used by the local playgroup on West Island. The playpark had been shut for more than 12 months because the sandpit was contaminated with asbestos-containing material.

An environmental consultancy engaged by the client developed a practical remediation plan to let the playpark reopen: screen the material to less than 7 mm.

The new shade sail structure over the playpark, with the ocean behind

300 m³

Of material screened

And replaced with clean fill

7 mm

Final screen size

After a first pass at 25 mm

12+ months

Playpark closed

Before the works let it reopen

How it was done

Working under its Restricted Asbestos Licence, Carey put in place a strict health, safety and environment plan to control the risks. It used a mobile screening method, attaching an engineered screen bucket to a skid steer loader, to screen the material first at less than 25 mm and then at less than 7 mm.

Scope of works

  • Excavating 300 m³ of material from the playpark
  • Screening it at 25 mm and 7 mm to remove asbestos-containing material
  • Installing geotextile as a separation layer
  • Replacing it with 300 m³ of clean fill
  • A new perimeter fence for the playpark
  • A new shade sail structure

Practical completion was issued in April 2019.

The playpark site cleared and refilled with clean sand Blue fencing screens the work area from the road The finished playpark behind its new perimeter fence A worker in a protective suit beside a stockpile of excavated sand

More projects

All civil projects
  • A renovated open-plan kitchen with a long island bench, new timber-look flooring and downlights

    Client on request · Newman WA · Jul 2023 - Mar 2024

    Newman Housing Uplift

    Renovation of residential homes for Newman-based mining staff and their families, with a 40% Indigenous workforce.

  • An excavator beside a partly demolished concrete water tank on cleared red ground in low evening light

    Water Corporation · Beverley WA · Aug 2022

    Beverley Town Water Tank Demolition

    Four redundant concrete water tanks, their asbestos piping and equipment removed for Water Corporation, and the site made ready to return to farmland.

  • Inside a refurbished steel-framed shed with new cladding and a mobile scaffold standing on the concrete floor

    Cocos (Keeling) Islands

    Cocos Islands Vehicle Shelter

    Repair and refurbishment of a corroded equipment shed on the Cocos (Keeling) Islands, before the asset was too far gone to salvage.

Ground to move? Let's talk.