Fremantle Inner Harbour Bollard Replacement & Refurbishment

Replacement and refurbishment of mooring bollards across the Fremantle Inner Harbour, at North Quay and Victoria Quay.

Location
North Quay and Victoria Quay, Fremantle WA
Client
Fremantle Ports
Year
2026

Following a condition assessment of the port's bollards, Carey delivered the prioritised remedial works, from full bollard replacement to blasting, repainting, bolt replacement and concrete remediation, bringing each bollard back to an as-new condition fit for 25 years of service.

The work was carried out at a live, working port, around berth operations and shipping.

Newly painted white bollards along the quay, with container cranes and stacked containers across the harbour

188

Bollards serviced

Across the Inner Harbour: replacement, repair, repaint and recoating

25 years

Of service

Each bollard brought back to an as-new condition

Live port

Berths kept operational

Throughout the works

Scope of work

  • New bollards installed across the Victoria Quay and North Quay container terminals
  • Blasting, repainting, bolt replacement and concrete remediation of existing bollards
  • Removal and disposal of outdated fender beams and piles
  • Temporary structures built for safe access and to protect personnel during the works
  • Deck concrete repaired to support the new bollards

The result

Each bollard was brought back to an as-new condition, fit for 25 years of service, while port operations continued uninterrupted.

A worn red bollard on a timber cradle inside temporary scaffolding at the wharf edge Rows of white-painted bollards laid out on the floor of a large shed

More projects

All civil projects
  • The bow of a large car carrier berthed at Fremantle Port, with utility vehicles and a site container on the wharf beside it

    Fremantle Port Authority · Fremantle Port WA · Jul - Oct 2023

    Fremantle Port Fender Replacement

    Demolition and replacement of the ship fender system at H Berth, carried out at a working port.

  • Mobile cranes lift a conveyor gallery section at Esperance Port, with the ship loader and stacked containers behind

    Southern Ports Authority · Esperance WA · Jul - Oct 2021

    Esperance Port Shiploader and Conveyor Demolition

    More than 520 tonnes of redundant steel structure removed at Berth 2, clearing a safe and accessible wharf for Southern Ports.

  • Aerial view of the renewed container hardstand at Esperance port, beside the ship loader

    Southern Ports Authority · Esperance WA · 2023 · $9.25M

    Berth 2 Hardstand Renewal

    A renewed container hardstand and a 220 kL stormwater holding tank at Esperance Port, delivered while the berth stayed open.

Ground to move? Let's talk.

Talk with our Civil Team