Fremantle Inner Harbour Bollard Replacement & Refurbishment
Replacement and refurbishment of mooring bollards across the Fremantle Inner Harbour, at North Quay and Victoria Quay.
- Location
- North Quay and Victoria Quay, Fremantle WA
- Client
- Fremantle Ports
- Year
- 2026
Following a condition assessment of the port's bollards, Carey delivered the prioritised remedial works, from full bollard replacement to blasting, repainting, bolt replacement and concrete remediation, bringing each bollard back to an as-new condition fit for 25 years of service.
The work was carried out at a live, working port, around berth operations and shipping.

188
Bollards serviced
Across the Inner Harbour: replacement, repair, repaint and recoating
25 years
Of service
Each bollard brought back to an as-new condition
Live port
Berths kept operational
Throughout the works
Scope of work
- New bollards installed across the Victoria Quay and North Quay container terminals
- Blasting, repainting, bolt replacement and concrete remediation of existing bollards
- Removal and disposal of outdated fender beams and piles
- Temporary structures built for safe access and to protect personnel during the works
- Deck concrete repaired to support the new bollards
The result
Each bollard was brought back to an as-new condition, fit for 25 years of service, while port operations continued uninterrupted.
Gallery
More projects
-

Fremantle Port Fender Replacement
Demolition and replacement of the ship fender system at H Berth, carried out at a working port.
-

Esperance Port Shiploader and Conveyor Demolition
More than 520 tonnes of redundant steel structure removed at Berth 2, clearing a safe and accessible wharf for Southern Ports.
-

Berth 2 Hardstand Renewal
A renewed container hardstand and a 220 kL stormwater holding tank at Esperance Port, delivered while the berth stayed open.