A high-reach excavator tears down a three-storey building, with rubble piled in front

Esplanade Hotel, Port Hedland

Redevelopment of the heritage two and three-storey stone hotel, from demolition and bulk excavation through concrete, structural steel and cladding to finished verandahs, courtyard, fencing and turf.

Location
Port Hedland WA
Timing
Dec 2025 to Sept 2026
Scope
Demolition and building

Carey demolished a multi-storey building on the site with high-reach excavators, then built a new three-storey, steel-framed accommodation building at the heritage hotel.

The work ran from bulk excavation and concrete slabs through structural steel, precast panels and cladding to timber-decked balconies, interior fit-out, landscaping, turf and steel palisade fencing.

The finished three-storey accommodation building with timber verandahs, a gravel path and new lawn in front

Scope of work

  • Demolition with high-reach excavators
  • Bulk excavation
  • Concrete slabs
  • Structural steel frame and precast concrete panels
  • Cladding and roofing
  • Timber-decked balconies and verandahs
  • Interior fit-out
  • Landscaping, turf and steel palisade fencing
The stone Esplanade Hotel with two levels of timber verandahs, behind Carey-branded site fencing on a street corner An excavator at the edge of a deep bulk excavation in red earth Concreters screed a freshly poured slab beside the building The new steel frame rises three storeys, with a boom lift beside it Cladding goes on the new building, with a boom lift at the upper floors A finished first-floor balcony with timber decking and a black steel balustrade New turf laid around a garden bed, seen from above A finished interior with an exposed timber cathedral roof and a timber floor New black steel gates open onto a gravel path and fresh lawn

More projects

All civil projects
  • Aerial view of the demolition site near the harbour, with broken concrete in rows, a tipper trailer, an excavator and a few remaining trees

    Port Hedland WA · May - Jul 2025

    Pier Hotel Demolition

    Removed asbestos, lead-based paints, synthetic mineral fibres and PCB fixtures, demolished 10 structures with their footings, internal roads, parking and buried services, and restored the site.

  • A renovated open-plan kitchen with a long island bench, new timber-look flooring and downlights

    Client on request · Newman WA · Jul 2023 - Mar 2024

    Newman Housing Uplift

    Renovated staff homes, some more than 50 years old, removing hazardous materials and fitting new kitchens, bathrooms, flooring, sheds and carports to designs by Carey's Indigenous architects.

  • Two cream transportable buildings with dark window shutters, set on a new concrete path and fresh mulch among gum trees

    Department of Health · Mandurah WA · Dec 2019 - Mar 2020

    Peel Health Campus Transportable Buildings

    Fabricated and installed transportable buildings providing eight offices, two universal access toilets and a storeroom, with site preparation and service connections.

Ground to move? Let's talk.

Talk with our Civil Team