Boodarie Demolition
Demolished large steel-framed warehouses and single-storey buildings, leaving a cleared site.
- Location
- Boodarie, Port Hedland WA
- Timing
- Aug to Oct 2025
- Scope
- Demolition
Carey's excavators, fitted with hydraulic shears and demolition grapples, stripped the cladding from large steel-framed warehouses and brought them down, then cleared the demountable and single-storey buildings across the site.
Debris was loaded out by tip truck, a water truck damped down the dust, and the ground was graded to a clear red-earth site. In October 2025 a mobile crane lifted a large plant module onto a truck.

Scope of work
- Demolition of large steel-framed warehouses
- Stripping of wall and roof cladding
- Demolition of demountable and single-storey buildings
- Load-out of demolition debris
- Dust suppression
- Site clearing and grading
- Removal of a large plant module by mobile crane
Gallery
More projects
-

Pier Hotel Demolition
Removed asbestos, lead-based paints, synthetic mineral fibres and PCB fixtures, demolished 10 structures with their footings, internal roads, parking and buried services, and restored the site.
-

Esperance Port Shiploader and Conveyor Demolition
Dismantled the redundant minerals shiploader, conveyor galleries and transfer towers at Berth 2, more than 520 tonnes of fabricated steel, with no adverse effect on shipping.
-

Beverley Town Water Tank Demolition
Demolished four redundant concrete water tanks, removed asbestos pipes and equipment, recycled the crushed concrete and steel, and finished two weeks ahead of schedule.